U disk customization logo required production period

Ordinary plastic card type U disk customization (full color printing logo required) Production period:
(1) minimum order quantity 100 pcs, duration: 2 days (requires color printing)
(2) 100 ------1000 pcs, duration: 3 days (color printing required)
(3) 1000 ------ 5000 pcs, duration: 4 working days (color printing required)
(4) 5000 --- 20000 pcs, duration: 6 working days (color printing required)
(5) 20000 --- 50000 ps, duration: 10 working days (color printing required)
(6) 50000 --- 100000 pcs, duration: 15 working days (color printing required)
(7) 100000 pcs, production time can be negotiated concretely.
 
 
Normal style U disk (need silk screen print logo) production period:
(1) minimum order quantity 100 pcs, duration: 3 days (need to  printing LOGO required)
(2) 100 ------1000 pcs, duration: 4 days (need to print silk screen LOGO)
(3) 1000 ----- 5000 pcs, duration: 5 working days (need to  printing LOGO required)
(4) 5000 --- 20000 pcs, duration: 7 working days (need to  printing LOGO required)
(5) 20000 --- 50000 pcs, duration: 12 working days (need to print silk screen LOGO)
(6) 50000 --- 100000 pcs, duration: 17 working days (need to printing LOGO required)
(7) More than 100000 pcs construction periods can be negotiated concretely.
 
Custom mold U disk (need to open a new mold) production schedule:
The mold engineer will design the mold drawing first. It takes more than one working day. In order to open the mold must get the customer confirms on the design drawing, then start to make the samples.
 
It takes 2 working days to open the PVC soft shell mold.
Ordinary silicone material shell mold takes 3 days to 7 days;
ABS plastic shell mold takes 15 days to 25 days;
Metal alloy shell mold takes 15 days to 30 days;
 
After the customer confirmed the physical sample, we began mass production / large-scale batch production, and began to count production time:
 
(1) 1000 ----- 5000 pcs, durations: 6 working days
(2) 5000 --- 20000 pcs, durations: 12 working days
(3) 20000 --- 50000 pcs, Duration: 17 working days
(4) 50000 --- 100000 pcs, durations: 25 working days
(5) More than 100000 pcs, construction periods can be negotiated

If you can't find what you are looking for, or have a special request that is not Listed in our range of products, please contact us:
 1、click here online;
 2、By email at: my@carausb.com

Need Assistance? Call us: +8615014148476 or Email Us
Add:6F, Building #24, LongBi Industrial Area, Bantian Town, LongGang District,ShenZhen,518129,China
China Bespoke USB Sticks Factory
CaraUSB©2018 All Rights Reserved